Preventive Maintenance • Efficiency

PM Risk & Frequency Optimizer

Assesses whether preventive maintenance tasks and frequencies align with the actual failure behavior and the desired risk level. Fewer unnecessary PM hours, greater impact.

Ideal for 'leaning out' PM without increasing risk — and for strengthening overdue or missing PM in a targeted way.
Key Points
🛠️ PM assessment — which tasks demonstrably add value (and which do not)?
⏱️ Frequency fit — too often / too rarely / wrong timing: visible per asset.
⚠️ Risk-aware — balance between downtime, safety, quality and cost.
📉 Fewer PM hours — fewer 'ritual' inspections, more targeted measures.
Investment
Project-based
Tailored proposal
Aligned with number of assets/tasks, data quality and desired depth.
Clear scope, fixed deliverables and transparent agreements upfront.
Ideal to reduce PM hours or strengthen PM on bottleneck assets.
  • Lead time upon request, depending on scope and planning.
  • Required: PM plan (tasks + frequencies) + failure history + asset list.
  • Result: 'keep / adjust / remove / add' advice + frequency indication.
Investment & Approach
Every PM environment is different. Therefore, we work with a tailored proposal on a project basis, aligned with scope (assets/tasks), data maturity and the desired depth of assessment.
Step What you receive
Intake & scope Alignment of assets, PM tasks, objective (reduce hours / control risk) and definitions.
Data & PM assessment Match PM plan with failure behavior, MTBF/MTTR and risk (safety/quality/downtime).
Advice & priorities “Keep / Adjust / Remove / Add” per task + frequency indication and quick wins.